Fill quantities and fill height of BBS002
BBS002 holds 1.62 m³ by calculation and carries 1,250 kg at safety factor 5:1. The table shows the weight of the full bag and the permitted fill height.
| Items | Material (guide value) | Bulk density t/m³ | Weight at full volume | max. fill height | Fill level |
|---|---|---|---|---|---|
| BBS002 | Sand, dry | 1,50 | 2,425 kg | 85 cm of 165 cm | 52 % |
| BBS002 | Gravel, chippings | 1,60 | 2,585 kg | 80 cm of 165 cm | 48 % |
| BBS002 | Rubble, mixed | 1,40 | 2,265 kg | 91 cm of 165 cm | 55 % |
| BBS002 | Soil, excavated material | 1,60 | 2,585 kg | 80 cm of 165 cm | 48 % |
| BBS002 | Cement, loose | 1,20 | 1,940 kg | 106 cm of 165 cm | 64 % |
Guide values as in the Fill Limit Calculator; the measured bulk density of your material is what counts. With dry sand, BBS002 reaches the load capacity at 85 cm fill height.
Quantity planning with BBS002
How many BBS002 do you need for a given quantity of material? The table uses the nominal volume of 1.62 m³ and 200 pieces per pallet. With sand (1.50 t/m³), the load capacity of 1,250 kg limits the fill quantity per bag to 0.83 m³.
| Items | Material quantity | Bags at full volume | Pallets | Bags for sand at the load capacity limit | Pallets |
|---|---|---|---|---|---|
| BBS002 | 10 m³ | 7 | 1 | 12 | 1 |
| BBS002 | 25 m³ | 16 | 1 | 30 | 1 |
| BBS002 | 50 m³ | 31 | 1 | 60 | 1 |
| BBS002 | 100 m³ | 62 | 1 | 120 | 1 |
Worked example for 100 m³ of material
How many BBS002 are needed depends on the density: with light material the volume of 1.62 m³ fills the bag; with heavy material the load capacity of 1,250 kg is reached earlier.
- Sand, dry (1.50 t/m³): 100 m³ weigh 150 t. One BBS002 takes 0.83 m³ or 1,250 kg; the load capacity of 1,250 kg sets the limit. You need 120 pieces, which is 1 pallets.
- Gravel, chippings (1.60 t/m³): 100 m³ weigh 160 t. One BBS002 takes 0.78 m³ or 1,250 kg; the load capacity of 1,250 kg sets the limit. You need 128 pieces, which is 1 pallets.
- Rubble, mixed (1.40 t/m³): 100 m³ weigh 140 t. One BBS002 takes 0.89 m³ or 1,250 kg; the load capacity of 1,250 kg sets the limit. You need 112 pieces, which is 1 pallets.
- Soil, excavated material (1.60 t/m³): 100 m³ weigh 160 t. One BBS002 takes 0.78 m³ or 1,250 kg; the load capacity of 1,250 kg sets the limit. You need 128 pieces, which is 1 pallets.
- Cement, loose (1.20 t/m³): 100 m³ weigh 120 t. One BBS002 takes 1.04 m³ or 1,250 kg; the load capacity of 1,250 kg sets the limit. You need 96 pieces, which is 1 pallets.
Handling of BBS002
- BBS002 has four lifting loops. With BBS002, always attach all four and close the outlet first.
- The inlet (swan neck) of BBS002, dimensions on request, is tied to the spout of the filling line. The outlet opens over the point of use.
- BBS002 is uncoated. Store it dry and covered; the fabric absorbs moisture.
- When filled, BBS002 weighs up to 1,250 kg. Lifting equipment, lifting accessories and ground must be rated for this.
- A pallet holds 200 pieces of BBS002. Store unused bags in their original packaging.