Fill quantities and fill height of BB70
BB70 holds 0.44 m³ by calculation and carries 1,000 kg at safety factor 5:1. The table shows the weight of the full bag and the permitted fill height.
| Items | Material (guide value) | Bulk density t/m³ | Weight at full volume | max. fill height | Fill level |
|---|---|---|---|---|---|
| BB70 | Sand, dry | 1,50 | 660 kg | full height, 90 cm | 100 % |
| BB70 | Gravel, chippings | 1,60 | 705 kg | full height, 90 cm | 100 % |
| BB70 | Rubble, mixed | 1,40 | 615 kg | full height, 90 cm | 100 % |
| BB70 | Soil, excavated material | 1,60 | 705 kg | full height, 90 cm | 100 % |
| BB70 | Cement, loose | 1,20 | 530 kg | full height, 90 cm | 100 % |
Guide values as in the Fill Limit Calculator; the measured bulk density of your material is what counts. With sand, BB70 stays below the load capacity.
Quantity planning with BB70
How many BB70 do you need for a given quantity of material? The table uses the nominal volume of 0.44 m³ and 450 pieces per pallet. With sand (1.50 t/m³), the load capacity of 1,000 kg limits the fill quantity per bag to 0.44 m³.
| Items | Material quantity | Bags at full volume | Pallets | Bags for sand at the load capacity limit | Pallets |
|---|---|---|---|---|---|
| BB70 | 10 m³ | 23 | 1 | 23 | 1 |
| BB70 | 25 m³ | 57 | 1 | 57 | 1 |
| BB70 | 50 m³ | 114 | 1 | 114 | 1 |
| BB70 | 100 m³ | 227 | 1 | 227 | 1 |
Worked example for 100 m³ of material
How many BB70 are needed depends on the density: with light material the volume of 0.44 m³ fills the bag; with heavy material the load capacity of 1,000 kg is reached earlier.
- Sand, dry (1.50 t/m³): 100 m³ weigh 150 t. One BB70 takes 0.44 m³ or 660 kg; the volume of 0.44 m³ sets the limit. You need 227 pieces, which is 1 pallets.
- Gravel, chippings (1.60 t/m³): 100 m³ weigh 160 t. One BB70 takes 0.44 m³ or 705 kg; the volume of 0.44 m³ sets the limit. You need 227 pieces, which is 1 pallets.
- Rubble, mixed (1.40 t/m³): 100 m³ weigh 140 t. One BB70 takes 0.44 m³ or 615 kg; the volume of 0.44 m³ sets the limit. You need 227 pieces, which is 1 pallets.
- Soil, excavated material (1.60 t/m³): 100 m³ weigh 160 t. One BB70 takes 0.44 m³ or 705 kg; the volume of 0.44 m³ sets the limit. You need 227 pieces, which is 1 pallets.
- Cement, loose (1.20 t/m³): 100 m³ weigh 120 t. One BB70 takes 0.44 m³ or 530 kg; the volume of 0.44 m³ sets the limit. You need 227 pieces, which is 1 pallets.
Handling of BB70
- BB70 has four lifting loops. With BB70, always attach all four; crane and forklift are possible.
- The skirt of BB70 is tied shut after filling. This keeps dust in.
- BB70 is coated. According to the data sheet the fabric protects against the ingress of moisture and is suitable for rain and outdoor storage. UV light still weakens it.
- When filled, BB70 weighs up to 1,000 kg. Lifting equipment, lifting accessories and ground must be rated for this.
- A pallet holds 450 pieces of BB70 (9 bundles of 50 pieces). Store unused bags in their original packaging.